Clipper Northampton ADC – Mezzanine & Amenity Block Extension

KAM led the delivery of a two phase project in a live warehouse at Clipper’s flagship ADC Northampton site.

Client: Clipper Logistics Plc

Category: Logistics and Distribution 100,000-300,000 sqft

Project Status: Completed February 2018


Project Role

Project Manager, Cost Manager and Employer’s Agent

Project Brief

Phase 1 was to install an additional 250,000 sq ft floor to an existing mezzanine structure, with a live operation below. KAM led the detailed coordination of this operation.

Phase 2 involved expanding the existing staff amenities through installing a lightweight mezzanine in the warehouse with office and canteen accommodation below.

Key Features

  • Extension of an existing mezzanine
  • Working around the live operation with minimal disruption for Clipper
  • KAM set up the migration strategy to move part of the operation into a temporary amenity block, to enable the Phase 2 works to progress

General Enquiries

Want to talk to us about a project?